Works Management
Engineering & Transport Contact Details
After Hours Emergency Only.
Director of Infrastructure ServicesRobert Whooley |
Works SupervisorBarry Moore |
Driveway Entrances
Council does not install driveway crossovers but will provide a contribution to the landowner for the first crossover to a property once a driveway crossover has been constructed to Council standards as follows:
Driveway Type
| Crossovers | 50% Contribution to Landowner |
|---|---|
| Across barrier kerb onto bitumen road | $195 |
| Across mountable kerb onto bitumen road | $155 |
| Unkerbed, requiring culvert onto bitumen road | $650 |
| Concrete Residential onto kerbed road | $350 |
| Unkerbed, not requiring culvert onto bitumen road | $155 |
| Unkerbed, requiring culvert onto gravel road | $590 |
| Unkerbed, not requiring culvert onto gravel road | $90 |
| Rural Crossovers, over standard size – 50% subsidy of actual cost | |
| Gate Permit Fee | $30.00 |
Private Works
| Plant Hire | per hour |
|---|---|
| Grader | $137.50 |
| Backhoe | $110.00 |
| Truck (3 tonne) | $88.00 |
| Truck (8 tonne) | $93.50 |
| Truck (12 tonne) | $110.00 |
| Tractor (Massey) | $74.00 |
| Tractor (Merlo) | $110.00 |
| Loader (Case 621) | $121.00 |
| Loader(KomatsuWA200) | $132.00 |
| Roller (Multi Wheel) | $93.50 |
| Roller (Vibrating) | $101.00 |
| Plate Compactor | $60.00 |
| Pedestrian roller | $60.00 |
| Provision of Labour Only | $45.00 |
| Rubbish Truck | $132.00 |
Per Day
Traffic Lights (minimum 1 day hire) $170.00
Roadworks Traffic Signs (per sign per day) $10.00
Per Tonne
Lime Sand $15.50
All other materials will be charged at cost plus 20%
Development Charges
The following are charges as set out in Councils Development Standards:
| Development Standard 1997 (under review) | $33.00 per copy |
| Inspection/Supervision Fee | 2.5 % of value of works Minimum $250.00 |
| Inspection/Supervision Fee (Where there is no local site superintendent provided by developer) | 3.5% of value of works Minimum $250.00 |
| Defects Liability Guarantee | 3.5 % of value of works Minimum $500.00 |
| Stabilisation Guarantee | |
|---|---|
| Subject to site classification | $nil to $3,960 per ha |
| Crossovers | |
| Depending on construction standard | $352.00 to $1,540.00 |
| Headworks Charges - Drainage | |
| Residential | $220.00 per lot or $2,200 per ha |
| Commercial & Industrial | $2,200 per ha or higher if required |
| Footpaths | |
| Asphalt | $55.00 per linear metre |
| Concrete | $55.00 per linear metre |
| Brick paving | $57.20 per linear metre |
| Dual Use Paths | |
| Asphalt | $88.00 per linear mtr |
| Concrete | $90.20 per linear mtr |
| Brick paving | $80.00 per linear mtr |
| Planting Maintenance Guarantee | Per the value of all planting |
| Water from Standpipes | $2.00 per kilolitre (GST free) |